Wednesday, July 01, 2009

The Office - Take 2 - Day 10

The progress of the office/spare bedroom now moves into the hallway to the private bathroom. The hallway which contains the closet and all of the stuff that doesn't fit in the closet. Which is a lot of stuff. Which is now back in the bedroom and the hallway. We have a lot of crap.


And a lot more crap.


And a crappy closet that has one shelf that is too high and not level. Stupid shelf. Stupidly designed closet. Unfortunately, this space isn't useful or functional at all. Pretty much we can't store things efficiently in here.


So we pulled everything out of the closet (refer to previous image of junk-ridden bedroom.) The empty closet, however, has to be demolished so that we can add some stuff back in. This closet is going to be redesigned just like the other closets in the house, but, financially, we need to save up a little bit before we can order it.



Upon the demolition, we discovered that the carpet was installed around one of the walls. The walls were poorly installed, but now we have a big hole in our carpet. Sigh.


Demoed closet!


And demoed spare bedroom. :(


The closet being out in the hallway and in the bedroom is distressing me greatly. My lovely spare bedroom has, yet again, become a closet in the interim. The major benefit of blogging a couple of days late is that I know the end of this story. You'll just have to wait and see. :)